
Feed micromet in to systems
Reduce scale formation
The No. 20L and No. 100L Micromet Pot Feeders are designed to slug or shot-feed chemicals into chilled water systems, hot water boilers, steam boilers, etc. The tank is composed of 11 gauge (20L) or 10 gauge (100L) Steel while the caps are cast iron. Other installation items such as the shut-off valves, elbows, nipples, strainers, tees, drain cocks, flow indicator, etc. are not included.
The feeder can also be used to introduce Micromet into commercial potable water systems for control of scale, corrosion and red iron staining. When doing so, it is necessary to utilize strainers and the FS01-7P Pyrex Flow Indicator. The flow indicator consists of a transparent Pyrex cylinder, containing a rubber ball, fitted in two castings having 3/4˝ female connections at each end.
It is important to install the feeder on a bypass arrangement (See Fig. 1 on Bulletin 3-404. Download by clicking on the "Product Information" tab.) particularly when feeding Micromet. In fact, when feeding Micromet, the feeder should be installed in a bypass on the COLD water line to the equipment to be protected. When putting Feeder before a water heater, place far enough away so that hot water will not flow back into Feeder. On private well systems where iron is present in the water, the Feeder must be installed before the water storage tank.
| Item Packaging Size | Case Quantity | Description |
|---|---|---|
| Each | 1.0 | Each |
Documents
Product Bulletin